Fatemi Residential Complex

The excavation and stabilization project of the Fatemi residential complex, located at Fatemi Square, was designed and implemented using methods such as nailing, anchoring, braced retaining structures, and corner bracing at a considerable depth of 17 meters. Furthermore, the impossibility of drilling to a depth of 7 meters on the street side due to urban infrastructure and the complexity of excavation due to the presence of highly collapsible soil categorized this project as complex and challenging. The excavation and stabilization operations of this project were fully conducted in compliance with technical and safety requirements within a period of 3 months
Location
Fatemi Square
Stabilization Method
Soil Nailing, Anchorage, Truss Retaining Structure, Corner Bracing
Activity
Design and Execution of Excavation and Stabilization
Client
Mr. Gholami
Excavation Depth
17 meters
Start Date
02 June 2646
Execution Time
90 Days